ToBe Builder

Integrated Planning and Collaboration for Construction.

ToBe Builder is an advanced planning and collaboration tool that integrates GIS, BIM, Schedule & Resources to provide a comprehensive virtual construction environment for all project stakeholders.

350%

Faster than traditional tools

466

Plant, people and materials

4D

GIS + BIM + Schedule + Resources

Beyond traditional construction planning.

ToBe Builder transcends traditional construction planning by offering a virtual construction environment where projects can be simulated with unparalleled precision and realism. This creates delivery certainty by allowing project teams to visualise and test construction methodologies before ground is broken.

The power of ToBe Builder lies in its ability to create a comprehensive digital asset that combines the context of the site (GIS), the detailed design (BIM), the project schedule (Time), and the specific construction techniques (methodology) to be employed - all in one application.

Key Features

Every tool you need to plan, visualise and communicate complex construction sequences.

Single 4D View Window

Single 4D View Window

A unified view of your GIS, BIM, resources, work zones and paths - all in one scene.

3D Work Zones

3D Work Zones

Create 3D work zones at any point on the GIS or within the BIM structure to model construction activity.

Work Paths

Work Paths

Visualise and control resources along paths through your site with animated keyframe sequences.

Selection Sets & View States

Selection Sets & View States

Save and restore known scene configurations instantly - useful for review sessions and handovers.

Measure Tool

Measure Tool

Measure any GIS or BIM object within the scene with precision - distances, areas and volumes.

Object & Task Inspectors

Object & Task Inspectors

Access all metadata and relationships for any object or scheduled task directly in the viewport.

See it in action

350% faster workflows.

ToBe Builder lets users set up their scene with project-native GIS, BIM and schedule data. Create sequences and complex construction methodologies, then export to video or AR - all from one application. Similar workflows in typical industry tools take more than three times longer.

  • ✓Integrates with Autodesk Construction Cloud (ACC)
  • ✓Trimble Connect native import
  • ✓Export sequences direct to ToBe XR & TobeMaps AR
  • ✓Video export for stakeholder reviews

Choose your edition

From full authoring power to read-only viewing - there's an edition for every role on your project.

ToBe Builder Ultimate  -  full 4D construction planning interface
ULTIMATEPRO

Builder Pro & Ultimate

Full desktop authoring with ACC/Trimble Connect imports, P6/Asta schedule sync, 4K video export, Grasshopper automations, and publish to XR.

ToBe Builder Lite  -  simplified authoring for XR publishing
LITEVIEWER

Builder Lite & Viewer

Lite: simplified authoring for creating and publishing XR views. Viewer: read-only access to review and explore published ToBe scenes.

Drag and drop resource library

466 drag-and-drop items, dimensionally accurate and fully rigged.

Real vendor equipment you drop into the same scene as the GIS, the BIM and the programme. The machine on the pad is the one you intend to hire, so the method you rehearse is constructible on site.

Live library model

The Maeda LC785M-8, as it sits in the library.

Drive slew, boom and hook with the same sliders Builder uses on this crane. It rests on a ground plane so you can judge reach against the pad, not empty space.

Westgate Tunnel Project  -  4D planning in ToBe Builder
Case Study

Westgate Tunnel Project

ToBe Builder verified the construction program, saved real costs by helping subcontractors understand erection sequences, and optimised pre-assembly workflows. The ability to load an accelerated program for immediate re-validation proved transformative.

“Workpack videos can be produced showing the exact location of EWPs and personnel. This software is a key differentiator for CPB.”
- Pat Rafferty, Project Manager, CPB Contractors

Try ToBe Builder for 14 days, free.

Get access to ToBe Builder PRO. No credit card required.